some finished photos... >>>
face clip now fastened every 6" and first coping piece installed. >>>
Face clips tacked in place... >>>
cap ply of DerbiColor FR begins... >>>
Cap ply installed over all wood nailers. >>>
One nailer on bottom, base ply over top, second nailer over the base ply.... >>>
First section in the open area, watertight with the roof system base ply of Derbibase >>>
dens deck mechanically fastened, 1 layer of Derbibase as a VB in permastic, 2 layers of iso, one in permastic, one in olybond, another layer of Densdeck in olybond.... and cant strips being installed in cement. [img size=576]http://www.rooferscoffeeshop.c>>>
finally... out in the open... >>>
deck completely detached from steel supports along perimeter.... >>>
patched with new deck.... >>>
hole patched with 22 ga. Type A deck which we always keep in stock for such occassions.... >>>
deck deficiency... >>>
patched with 18 ga. steel plate... >>>
pipe was disconnected, pulled up, and being attached to drain pan/bowl >>>