English
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
OCS - OutdoorCoffeeShop
Contractor Outlook - Sponsored by SRS
MuleHide -  Ad - The Right Products - Spanish Version
Brava -  - Technical Services Available on Demand
Certainteed - Whats new in solar  ad
Brava - Spanish Tile -
RCS -  - L&L contest
English
English
Español
Français

Lessons Learned: Trades that Need to Include an AVB Discussion in their Specification & Preinstallation Meetings

abaa - education - SM

 

When designing a building envelope wall system, specifying, detailing and having a pre-installation discussion about the backup substrate and façade elements, considering the water, air, vapor and insulation systems detailing, is critical. This involves careful coordination with all façade trade elements, consideration of construction and installation tolerances, addressing the installation requirements for the substrate wall, water and air resistive barriers, insulation and façade support system, and learning lessons from each installation. Each component must be thoroughly understood and specified within their respective specification sections to ensure comprehensive detailing. By understanding the necessary connections, material compatibility, tested systems and limitations of construction materials, you can develop pre-installation conversation points within each building envelope and substrate meetings to proactively develop an advanced conversation about detailing, grasping the construction requirements for each component and incorporating lessons learned will enhance future detailing and specifications will significantly improve the chances of project success.

Learning Objectives:

  • Identify early structural design considerations needed to maintain air, vapor, water, insulation and rainscreen systems in bid documents.
  • Incorporate construction tolerances when detailing substrate walls and control layers for various façade systems.
  • Recognize common substrate and façade wall systems and the detailing needed to coordinate drawings and specifications.
  • Apply lessons learned on continuity, fastening, membranes and system tolerances to improve coordination and guide pre-installation meetings.

Presenter: Corey Zussman, , AIA, NCARB, ALA (IL, IN, WI), RBEC, RRC, REWC, RWC, RRO, CABS, CCQM, CDT, CQM, CxA+BE, BECxP, LEED AP BD+C, Level II Thermographer, QA/QC Vice President, AECOM Hunt Construction

Register for the webinar.


SOPREMA - Banner Ad - Furbish BioWall
English
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
OCS - OutdoorCoffeeShop
Malco Group -  Ad - Veto Pro Pac Spring Promo March-May
Sherwin Williams Roofing Solutions -  - Polyurethane
APOC - CCS  - ProProgram - June
RCAW - Roofing Award  Ad Dec 2025
Tyelus -  Ad - OC Coming Soon
Job Search - HI-Peak -