Material hoisting problem

« Back To Roofers Talk
Author
Posts
May 24, 2011 at 1:34 p.m.

successisnotanoption

How do you ramp up production by loading a roof 250' in the air, without using cranes?

Here are the parameters of the job:

1. Retractable roof is 250 feet high 2. Cannot place crane inside stadium bowl 3. Cannot use lattice boom or tower crane 4. Cannot secure material hoist to exterior of building 5. Hurricane season begins in 8 days

We have run low on ideas to resolve this issue, and the concept of hand-loading is ridiculous. Any realistic suggestions will be gratefully taken.

EDIT: The GC wants us to ramp up production, but is not allowing us the use of cranes or secured material hoists.

May 27, 2011 at 9:53 a.m.

successisnotanoption

We've found a helicopter crane company that can handle the job. If we work out the details, I will be sure to take some photos and videos and post them on YouTube.

May 26, 2011 at 1:52 p.m.

ottawa_roofer

Ask Scotty to Beam it up.. :laugh: Robby the Roofer makes a point.

May 26, 2011 at 10:32 a.m.

successisnotanoption

The max weight on the pallets is about 3000 #. We are loading ISO and Securock.

May 25, 2011 at 4:59 p.m.

jimAKAblue

successisnotanoption Said:
jimAKAblue Said: Helicopter or 100 Hispanics standing on each others shoulders.

http://www.rent-helicopters.com/aerial%20work/rent-aircrane-helicopters.html

I am looking into the helicopter angle now. Do you have any idea what the costs are?

I don't know but there was a phone number on that website and you could get a good answer in five minutes.

You really don't have any other choice other than to tell the GC that you'll do the job if he stages the materials.

The helicopter is expensive but miracles are twice as much.

May 24, 2011 at 9:21 p.m.

jcagle9595

successisnotanoption Said:
jimAKAblue Said: Helicopter or 100 Hispanics standing on each others shoulders.

http://www.rent-helicopters.com/aerial%20work/rent-aircrane-helicopters.html

I am looking into the helicopter angle now. Do you have any idea what the costs are?

Last price I knew for the copter was $6,500. an hour. That was in 1986. I imagine it's gone up a bit by now ;)

BTW, the blades put out a hurricane force wind, and anything loose near it must be secured or removed.

May 24, 2011 at 3:10 p.m.

successisnotanoption

jimAKAblue Said: Helicopter or 100 Hispanics standing on each others shoulders.

http://www.rent-helicopters.com/aerial%20work/rent-aircrane-helicopters.html

I am looking into the helicopter angle now. Do you have any idea what the costs are?

May 24, 2011 at 2:18 p.m.

jimAKAblue

Helicopter or 100 Hispanics standing on each other's shoulders.

http://www.rent-helicopters.com/aerial%20work/rent-aircrane-helicopters.html


« Back To Roofers Talk
You must be logged in to reply to this topic.

SRS - Banner Ad - Commercial Distribution Specilaists
English
English
Español
Français

User Access


Glo Group - LDR Accelerator - Sidebar
ServiceFirstSolutions-Grow-Sidebar
Glo Group - LDR Accelerator - Sidebar
Pli-Dek - Waterproofing L&L - Sidebar
CT_SidebarAd 6-25
Brava - Spanish Tile - Sidebar
APOC - CCS Sidebar - ProProgram - June