English
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
Malco Tools - Sidebar Ad - Metal Benders
Wil-Mar - Sidebar - Free Pipe Collar 10/23
Geocel - Sidebar - 50th Anniversary - Feb 2024
Georgia-Pacific - Sidebar Ad - HD ISO
Project Map It - Side Bar - Digital Portfolio
RCS - Sidebar - L&L contest
RoofersCoffeeShop - Where The Industry Meets!
English
English
Español
Français

WSRCA Informational Bulletin 2018-LSI3: Roof-Mounted Solar Photovoltaic Systems

JUN - IndNews - WSRCA - WSRCA Informational Bulletin 2018-LSI3 Roof-Mounted Solar Photovoltaic Systems
June 28, 2018 at 10:30 a.m.

WSRCA believes coordinated collaboration between the roofing and solar photovoltaic industries is paramount for shared success.

As the roof-mounted photovoltaics (PV) industry continues to expand with new products and attachment systems routinely getting introduced as the next best thing, it is imperative that roofing industry associations, such as the Western States Roofing Contractors Association (WSRCA) take a leading position and remain keenly involved to provide clear direction and recommendations for proper integration of PV systems with various roofing assemblies. WSRCA believes coordinated collaboration between the roofing and solar photovoltaic industries is paramount for shared success.

Within the collaborative environment, one of the main questions to ask as a PV system is first being considered is: "What is the condition of the existing roof system"? It may not be appropriate to install a PV system unless the anticipated life expectancies of the systems are coordinated with installation of a new roof system or a new roof covering (e.g., shingles, membrane, tile, etc.) as well. You do not want to install a new photovoltaic system over an old roofing system, only to realize a few years later that a new roof is needed and the PV system must be dismantled and removed in order to reroof. The warranty status of, and the remaining service life of an existing roof membrane system, and new Building Code requirements also need to be evaluated early in the PV system design process.

Login to continue reading.

Discuss this topic on WSRCA’s Roof Talk.

Not a WSRCA member? Join here.



Recommended For You


Comments

There are currently no comments here.

Leave a Reply

Commenting is only accessible to RCS users.

Have an account? Login to leave a comment!


Sign In
APOC - Banner - Loyalty Program - Jan 24
English
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
RoofSnap - Sidebar - Gutter Measurements
Roofle - Sidebar Ad - RoofQuote Pro
GCMC-Podcast-WinTraining-Sidebar-2
Leister - Sidebar - VARIMAT + LQS - May
IKO - Sidebar - Summit Grey
Westlake ad corrected size