English
English
Español
Français

User Access


Imperfelx Ads - Bitec 250x265 (1).jpg
SRS - Sidebar Ad - Your complete source for solar solutions & building products
Equipter - Sidebar Ad - Drive. Lift. Dump. Repeat.
Wil-Mar-LittleLeaks-BigProblems-Apr-25-Sidebar
ABC Supply - Sidebar Ad - Deliver Success in Any Project
Roof Hugger - Sidebar - Q1
R-Club Quarterly Training - Sidebar Ad - May 2025
English
English
Español
Français

Quality Control and Specification Compliance

« Back To Observations from the Field
Author
Posts
February 24, 2025 at 10:41 a.m.

HannahFord7

Issue: While performing roof installation observation, the Benchmark Field Consultant observed numerous issues with the quality of the workmanship of the roofing contractor. Fasteners for the induction weld system were not properly installed, loose fasteners, large gaps between the joints of the insulation and the vapor barrier was improperly installed, with seams not sealed and the vapor barrier did not extend up the walls or curbs as required.

February 24, 2025 at 10:47 a.m.

HannahFord7

Benchmark Service: Construction Phase Services

Solution: General contractor was notified and the roofing contractor was asked to remove the 200 squares installed. A meeting was held to ensure that the roofing contractor would follow all details required from the architect and manufacturer.

Possible Impact: These deficiencies, had they not been corrected, would have resulted in multiple issues with the roof system installation. Fasteners must be placed in a proper grid pattern to ensure the system will achieve the designed uplift resistance. Improper installation will cause greater stress and increased load on some or all of the induction weld fasteners. Gaps in the insulation will not provide the proper R-value required causing possible condensation. Improperly sealed laps in the vapor retarder will not prevent any vapor drive into the new insulation. Loose fasteners will tent and cause damage to the new roof membrane. Without intervention by Benchmark, the Client may have been left with an unwarrantable roof requiring persistent repairs.


« Back To Observations from the Field
You must be logged in to reply to this topic.

RCS - L&L contest
English
English
Español
Français

User Access


Imperfelx Ads - Bitec 250x265 (1).jpg
FRSA - Side Bar - FRSA Annual Convention & Expo 2025
WSRCA - Sidebar Ad - WRE 2025_04.24.2025
Contractor Outlook - Sponsored by SRS
Quarrix - Sidebar - ProTect - Dec
VaproShield-MoisturePhotoSwag-Sidebar
R-Club Quarterly Training - Sidebar Ad - May 2025