Improper Design and Installation

« Back To Observations from the Field
Author
Posts
March 19, 2025 at 2:49 p.m.

HannahFord7

Issue: Benchmark was asked to review design documents in preparation for destructive testing of a recently constructed roof system on a new building at a paper manufacturing facility.  The design of the parapet wall and associated cavity did not include a vapor retarder or seal.  Due to high heat and humidity generated by production activities on the interior, a vapor retarder/seal is required to prevent moisture migration and condensation within the wall cavity.

March 19, 2025 at 2:52 p.m.

HannahFord7

Benchmark Service:Design Review

Solution: Proper design and/or peer review of the construction documents prior to installation would have prevented the detail from lacking this key component. Additionally, hiring an unbiased third-party consultant to observe roof installation and advocate for the Owner would have helped avoid this situation. Reportedly, the condition was discussed during installation and the contractor opted to complete the detail as specified for cost saving reasons. The Owner now must rectify the condition by dismantling the wall, removing all wet components, installing a vapor retarder/seal, and replacing components.

Possible Impact: The direct result of the absence of a vapor retarder/seal at this critical juncture led to moisture migration and condensation within the wall cavity, saturated insulation, decreased R-value, condensation collecting on/in the interior walls, corroded fasteners, deteriorated plywood, unadhered flashings, organic growth, formation of ice on the building exterior which has created an unsafe condition due to falling ice, and ultimately water intrusion into the one-year-old roof and building. Left as is, this condition will promote early roof failure and result in significant expense to the owner.


« Back To Observations from the Field
You must be logged in to reply to this topic.

Adams & Reese - Banner Ad - Legal Must-knows for Roofers (RLW)
English
English
Español
Français

User Access


Imperfelx Ads - Bitec 250x265 (1).jpg
SRS - Sidebar Ad (En Espanol Page) - Roof Hub
Owens Corning - Sidebar - Roofle + OC - June
WSRCA - Sidebar Ad - WRE 2025_04.24.2025
Sales Assist - Sidebar Ad - Build Present Close
Leap - Sidebar - Free Trial
Maven Group SIdebar Ad