Skip to main content
Translate
Default
English
Español
Français

User Access


Contractor Outlook - Sponsored by SRS
Geocel -  Ad - 4350 Hybrid
ASC Building Materials -  - Coatings
IFD - Building Roofing
Contractor Outlook - Sponsored by SRS
ServiceTitan -  Ad - OnePlatform
RIIG -  Ad - AI Integrated Solutions
Translate
Default
English
Español
Français
Roofing Around the World
Starts in
03 days 21 hours 27 minutes 24 seconds
Learn More
Curtain Ad
Curtain Ad

Improper Design and Installation

« Back To Observations from the Field
Author
Posts
March 19, 2025 at 2:49 p.m.

HannahFord7

Issue: Benchmark was asked to review design documents in preparation for destructive testing of a recently constructed roof system on a new building at a paper manufacturing facility.  The design of the parapet wall and associated cavity did not include a vapor retarder or seal.  Due to high heat and humidity generated by production activities on the interior, a vapor retarder/seal is required to prevent moisture migration and condensation within the wall cavity.

March 19, 2025 at 2:52 p.m.

HannahFord7

Benchmark Service:Design Review

Solution: Proper design and/or peer review of the construction documents prior to installation would have prevented the detail from lacking this key component. Additionally, hiring an unbiased third-party consultant to observe roof installation and advocate for the Owner would have helped avoid this situation. Reportedly, the condition was discussed during installation and the contractor opted to complete the detail as specified for cost saving reasons. The Owner now must rectify the condition by dismantling the wall, removing all wet components, installing a vapor retarder/seal, and replacing components.

Possible Impact: The direct result of the absence of a vapor retarder/seal at this critical juncture led to moisture migration and condensation within the wall cavity, saturated insulation, decreased R-value, condensation collecting on/in the interior walls, corroded fasteners, deteriorated plywood, unadhered flashings, organic growth, formation of ice on the building exterior which has created an unsafe condition due to falling ice, and ultimately water intrusion into the one-year-old roof and building. Left as is, this condition will promote early roof failure and result in significant expense to the owner.


« Back To Observations from the Field
You must be logged in to reply to this topic.

Tremco - Banner Ad - Growing Green Careers: The Future of Construction (David Hutchinson Podcast)
Translate
Default
English
Español
Français

User Access


Contractor Outlook - Sponsored by SRS
Van Mark Products -  Ad - OctNov2026 Rebates
PEPA -  Ad - Modern Materials Made to Last
RCS UK -  Ad - Launch
Lakeside Construction Fasteners -  Ad - T17 WOOD-X
HS Exit Advisors -  - Blueprint eBook
Kool Seal -  - Sales Rep - May 24