English
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
https://ad.doubleclick.net/ddm/trackclk/N30602.4638641ROOFERSCOFFEESHOP/B34763147.443088604;dc_trk_aid=636638283;dc_trk_cid=252286514;dc_lat=;dc_rdid=;tag_for_child_directed_treatment=;tfua=;gdpr=${GDPR};gdpr_consent=${GDPR_CONSENT_755};ltd=;dc_tdv=1
Malco Group -  Ad - Veto Pro Pac Spring Promo March-May
TAMKO -  Ad - Hailguard April Campaign
CertainTeed EPG -  Ad -  Stronger A
All Weather Insulated Panels -  Ad - InnovaCELL
Western Colloid -  Ad - Subscribe to our YouTube channel
English
English
Español
Français
« All Events

Resolving Complex Geometries for Iconic Towers: Combining Unitized and Stick Built Curtain Wall Systems in High-Rise Designs - copy

December 18, 2025 @ 11:15 am - 12:15 pm EST

ABAA - Rewind 2025 webinar - sm

 

Presenter: Manan Raval, PE – Partner – Building Envelope/Facade Engineering, Hatfield Group Engineering

This session will explore curtain wall detailing, fabrication, testing, and installation oversight strategies for resolving complex geometries involved in iconic high-rise tower design that combine stick-built and unitized systems. It will begin with a general overview of the key differences between stick-built and unitized curtain wall systems, covering the pros and cons of both in terms of water and air barrier performance, schedule and cost efficiency, quality control, installation time, construction equipment and labor demands, and inspection requirements. It will also explore why, though unitized curtain wall systems are typically preferred for high-rise design, combining unitized and stick-built systems can yield better performance and aesthetic results, and how by rationalizing the facade design the systems can be combined effectively. It will also provide valuable insights into economical procurement options for curtain walls, as well as the structural performance of curtain walls and how various anchorage systems affect it. The presentation will also explore common pitfalls in curtain wall installation that threaten to compromise building performance and strategies to overcome these issues, which include installation errors, gasket and seal degradation, and sealant issues. The presentation will conclude with a discussion of a case study, Halo Tower in Newark, NJ, a high-design three-tower development that includes Newark’s tallest building. The tower gracefully combines unitized and stick-built curtain wall systems to achieve its complex geometries, which include distinctive facade slices, stepped terraces, inclined glass panels, and curved glass elements.

Register Here!



Details

Dec 18, 2025 @ 11:15 am EST
Dec 18, 2025 @ 12:15 pm EST

Eagleview - Banner Ad RLW Watch - Capitalizing on Google’s Shift to Online Estimates
English
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
Certainteed - Whats new in solar  ad
Bitec -  Ad - 40 Years of Excellence
Rocky Mountain Snow Guards -  Ad - 90 Day Sale 2026
Western Colloid -  Ad - Subscribe to our YouTube channel
TAMKO -  Ad - Hailguard April Campaign
Velux  ad Shine a New Light