Skip to main content
Translate
Default
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
Kool Seal -  - Sales Rep - May 24
NFRC - - Weather the Storm
MuleHide -  Ad - Fleece Back Oct 2025
Sherwin Williams Roofing Solutions -  - Polyurethane
IFD - Building Roofing
ABC Supply -  Ad - No matter the roof, we
2026 Roofing Industry Trends Revealed
Starts in
05 days 04 hours 01 minutes 26 seconds
Learn More

Where roofing contractors quietly lose margin

Where roofing contractors quietly lose margin
November 28, 2026 at 1:00 a.m.

By John Kenney, Cotney Consulting Group. 

Margin does not disappear through one dramatic event, but rather through repeated losses that the business does not identify soon enough. 

Most roofing projects do not lose profit because of one major mistake. Margin usually disappears in smaller amounts through a series of operational decisions, delays and inefficiencies that seem manageable on their own. A delivery is rearranged, plant remains on hire for several extra days, materials are handled more times than expected, operatives wait for access or a variation is identified but not valued promptly. The project manager may also spend additional time resolving issues that should have been addressed during the handover. 

Each cost may appear minor, but together they can turn a profitable tender into a disappointing final result. This is why margin protection cannot be left entirely to the estimating or commercial team. It is an operational responsibility that continues throughout the project. The original price may have been accurate. The problem is often that the work was not delivered in the way the estimate assumed. 

Margin is lost through accumulation 

When a project underperforms financially, the first question is often whether the estimate was too low. Sometimes it was. However, many projects lose margin through a series of operational events that were not included in the original plan. The team may complete the work in a different sequence, materials may be delivered to a location that creates additional handling or access equipment may be required for longer than anticipated. Supervisory time may increase, the client may change working areas or small amounts of extra labour may be absorbed without being connected to a specific cause. 

None of these issues may be serious enough to stop the project, which is precisely what makes them difficult to control. Large problems usually attract immediate attention. Smaller losses can continue for weeks because they appear to be part of normal project activity. By the time the financial result is reviewed, the cost has already been incurred. 

Labour waiting time is still labour cost 

Roofing contractors often monitor how long installation activities take, but they do not always track how much paid time is spent waiting. Operatives may wait for access, permits, lifting equipment, material deliveries, design information or another trade to complete its work. They may arrive on site and discover that the planned roof area has not been released. The team is present and being paid, but productive work cannot begin. 

Waiting time is often hidden inside the total labour cost. It may not appear separately in the project records, so the business sees only that the labour allowance has been exceeded. Without better information, the company may conclude that the site team worked too slowly when the real problem was that the work was not ready. This distinction matters because the correction is different. 

A productivity problem may require training, improved supervision or a revised labour allowance. A waiting-time problem may require stronger planning, earlier coordination or better client communication. The cost may look similar in the final accounts, but the operational cause is not the same. 

Additional material handling consumes profit 

Material handling is another area where margin can disappear quietly. The estimate may assume that materials will be delivered close to the work area and moved once before installation. In practice, they may be unloaded in a temporary location, moved for storage, moved again when access becomes available and then distributed across the roof. 

Every movement requires labour. It may also require plant, supervision and additional protection against damage or weather. The contractor does not earn more revenue because materials were handled three times instead of once. The additional cost is absorbed into the project. 

This is why delivery, storage and lifting arrangements should be planned during tendering and confirmed before mobilisation. The project team should know where materials will arrive, how much storage is available, how they will reach the roof and whether those access arrangements will remain available throughout the work. Poor material flow becomes a labour problem very quickly. 

Plant costs increase when programmes move 

Plant hire often appears predictable during estimating. The contractor allows for a crane, telehandler, hoist, mobile elevating work platform or another item of access equipment for an expected period. The cost becomes less predictable when the programme changes. A delay of several days may require a full additional week of hire. A sequence change may require equipment to be moved or returned later. Shared plant may be unavailable when needed, leading the contractor to arrange an alternative at short notice. 

The daily hire rate is only part of the cost. Delivery, collection, fuel, operator time, permits and mobilisation may all increase the financial impact. Plant should therefore be monitored as an active project cost rather than treated as a fixed allowance that will look after itself. The project manager should know when each item is expected to arrive, how long it is required and what must happen before it can be released. When plant remains on site without a clear purpose or end date, margin is already under pressure. 

Poor sequencing creates invisible inefficiency 

The sequence in which roofing work is completed has a direct effect on productivity. A well-planned sequence allows operatives, materials and plant to move logically through the project. A poor sequence creates repeated mobilisation, incomplete areas and unnecessary movement. 

The team may begin one roof area, stop because information is missing, move to another area and later return to complete the first. Temporary protection may need to be installed more than once, materials may be redistributed and inspections may be delayed. Supervisors may also spend additional time coordinating several incomplete workfaces. 

The project may still appear busy, but activity and productivity are not the same. A roofing team can work hard throughout the day while the project makes less progress than expected because the sequence is fragmented. The contractor should therefore review not only how many operatives are on site, but whether they have enough uninterrupted work to use their time effectively. 

Late procurement creates more than delay 

When materials are ordered late, the obvious risk is that they will not arrive in time. The financial effects can go much further. The contractor may pay additional carriage, accept higher prices, split orders or source materials from a less favourable supplier. The project may require temporary protection or resequencing while waiting for the missing item. Labour and plant may remain committed to a site that cannot progress as planned. 

In many cases, the issue begins before the order is placed. An approval, dimension, technical submission or client decision may remain outstanding longer than expected, gradually reducing the available manufacturing window. Procurement should therefore be managed backwards from the required delivery date. 

The team must understand when the material is needed, how long manufacture or supply will take, what information is required before release and who is responsible for obtaining that information. Without that discipline, every procurement issue becomes urgent. Urgency usually costs more. 

Rework reduces margin twice 

Rework creates an obvious labour cost because the contractor must correct work that has already been completed. It also creates less visible costs. The team may need to remobilise, reopen completed areas, move materials, arrange access or work around other trades. Supervision and inspection time increase; the client may lose confidence, and the project manager may spend additional time managing communication and records. 

The contractor has already paid to complete the work once. It is now paying again to correct it. The cause of rework may be workmanship, but it may also be incomplete drawings, unclear details, incorrect materials, poor coordination or inadequate supervision. That is why quality control should begin before installation. 

The site team needs the correct information, materials and expectations from the start and inspections should happen early enough to identify problems before they are repeated across a larger area. A defect corrected immediately may be manageable. The same defect repeated across hundreds of square metres can become a serious financial loss. 

Unrecorded changes become contractor costs 

Additional work is common in roofing. Existing conditions may differ from the tender information. The client may revise a detail, access may change, temporary protection may be extended, the sequence may be altered or additional preparation may be required. The commercial risk begins when the site team does not recognise, record or communicate the change. 

If the additional work is completed without proper records, the contractor may struggle to demonstrate what changed and how it affected cost. Labour, materials and plant are then absorbed into the project. The project manager may remember the issue, but memory is not an effective commercial record. 

Site reports should identify instructions, delays, additional work, changed conditions and the resources affected. Photographs, labour records and delivery information should support the account where appropriate. The earlier a change is recorded, the easier it is to manage. Late reconstruction is difficult and often incomplete. 

Delayed commercial action weakens recovery 

Recognising a variation is only the first step. It must also be communicated and valued promptly. A variation submitted several weeks after the work was completed is harder to explain, support and recover. The people involved may no longer remember the detail, records may be incomplete and the client may question why the issue was not raised earlier. 

Late commercial action affects both margin and cash flow. If the contractor cannot recover the full value of the work, profit is reduced. If recovery is delayed, the business is also financing labour, materials and plant for longer than planned.  

The project manager, site team and commercial team must therefore work closely. The site identifies the change, the project manager confirms the operational impact and the commercial team protects the contractual position and values the work. When those responsibilities are disconnected, additional work can remain unresolved until the end of the project. By then, the contractor has already carried the cost. 

Weak site reporting hides the real cause 

Poor records do more than weaken variation recovery. They also make it difficult to understand why the project is losing money. A labour report may show 80 hours used against an allowance of 60, but without information about access, weather, waiting time, changed sequence or additional work, the numbers provide little explanation. The business knows there is an overrun, but it does not know what caused it. 

Good site reporting should give management enough information to connect cost with activity. It should show how many operatives were present, what work was completed, what prevented progress, which instructions were received, what deliveries arrived, which areas were unavailable and what action is required. The purpose is not to create paperwork for its own sake. The purpose is to provide early visibility. A problem identified this week can still be managed. A problem discovered after completion can only be explained. 

Extended supervision is often overlooked 

Supervision is sometimes treated as a general project allowance rather than a cost that should be monitored against the programme. If the project runs longer than planned, supervisory cost continues. The site manager, supervisor or contracts manager remains involved; meetings continue, reports are still required and coordination, travel and client communication take more time. 

A two-week programme extension may therefore affect far more than site labour. The contractor may also need continued welfare, security, insurance, temporary works or office support. These costs are rarely dramatic on any single day, but they become significant when the project continues beyond the period included in the tender. The business should understand the full weekly cost of keeping a project open. That creates a clearer picture of the financial effect of delay. 

Margin must be reviewed while there is time to act 

Many contractors review financial performance after the project has finished. That is too late for effective control. Project cost should be reviewed while work is still in progress. The contractor does not need a perfect accounting exercise every week. Still, it does need enough information to understand whether labour, materials, plant, subcontract costs and variations are moving in the expected direction. 

If labour is exceeding the allowance, management should know before the remaining work is completed. If plant is likely to be extended, the team should identify the reason and determine whether the cost can be reduced or recovered. If a variation remains unvalued, someone should own the action. If materials are being consumed faster than expected, the quantity or waste assumption should be checked. Early review gives the contractor options. Late review provides history. 

Protecting margin is an operating discipline 

Margin protection does not come from one meeting, report or person. It comes from the way the project is estimated, handed over, planned, documented and managed every day. The estimator must establish realistic assumptions. The project manager must test those assumptions against current conditions. The site team must report changes and disruption. Procurement must manage critical materials before they become urgent. The commercial team must act while records are current and entitlement can still be protected. Leadership must review performance early enough to make decisions. 

None of these responsibilities operates independently. Poor planning becomes waiting time. Late procurement becomes additional carriage. Weak records become unrecovered variations. Poor sequencing becomes labour overrun. Delayed decisions become extended plant and supervision. 

This is how margin disappears: Not through one dramatic event, but through repeated losses that the business does not identify soon enough. The tender creates the opportunity for profit. Disciplined project delivery is what protects it. 

Learn more about Cotney Consulting Group in their Coffee Shop Directory or visit www.cotneyconsulting.com.

About the author 

John Kenney has more than 45 years of experience in the roofing industry. His career has included every level of roofing operations, from field installation and estimating through executive leadership. He is CEO of Cotney Consulting Group, a partner member of the International Federation for the Roofing Trades and earned the MIoR designation from the former Institute of Roofing in the United Kingdom. He works with roofing contractors to improve estimating, project management, operational performance, leadership and profitability.



Recommended For You


Comments

There are currently no comments here.

Leave a Reply

Commenting is only accessible to RCS users.

Have an account? Login to leave a comment!


Sign In
NFRC - Banner - Weather the Storm
Translate
Default
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
Equipter - 4000 -
SRS -  Ad - TopShield TS20
Sherwin Williams Roofing Solutions -  - Polyurethane
PEPA -  Ad - Modern Materials Made to Last
Project Map It -  Ad - Close More Roofing Jobs With Project Map It
IFD - Building Roofing