Translate
Default
English
Español
Français

User Access


SRS -  Ad - TopShield TS20
Johns Manville -  Ad - Recursos en Español
Malco Group -  Ad - One Partner, Countless Solutions
Brava - PRO Portal -
TAMKO - En Espanol  Ad - StormFighterFLEX August
CAM (Drexel Metals) -  Ad - Visualizer
Translate
Default
English
Español
Français

shutes

« Back To Roofers Talk
Author
Posts
June 14, 2012 at 4:28 p.m.

prsroof

having the proper counter weights how high can i hang garlock shutes with out securing to building i done 4 stories before no problem

June 17, 2012 at 9:14 a.m.

prsroof

trash shutes 6 stories and at the bottom pull the shute off the wall over a i store about 15'. normally i would have a crane pull off debris or use a hydralic hoist but there no access and with the lower roof section hoist is no good. 200 sqs.


« Back To Roofers Talk
You must be logged in to reply to this topic.

APOC - Banner - Restoration Index
Translate
Default
English
Español
Français

User Access


VELUX -  ad - Shine a New Light
RCS Canada -  Ad - Canada Microsite Launch
SRS -  Ad (En Espanol Page) - Roof Hub
TAMKO - En Espanol  Ad - StormFighterFLEX August
IFD Connection Forum 2026 -  Ad
ServiceTitan -  - Roofing and Exteriors Market Report