Translate
Default
English
Español
Français

User Access


Sign up for Week in Outdoors eNews!
WSRCA -  ad - WRE Ticket Giveaway
Johns Manville -  Ad - Recursos en Español
RIIG -  Ad - AI Integrated Solutions
Western Colloid -  Ad - Subscribe to our YouTube channel
ASC Building Materials -  - Coatings
Rocky Mountain Snow Guards -  Ad - Show Us Our Snow Guards 2026
Translate
Default
English
Español
Français

Question.

« Back To Roofers Talk
Author
Posts
September 10, 2010 at 11:42 a.m.

FL Roofer

Which would you say is the fastest method of running three tabs? Racking- forty five accross the roof, or column, up to the ridge and back down.

September 11, 2010 at 6:21 p.m.

robert

When i arrived in Florida in 1989 i had been running 3 tabs on 5 for years and hand nailing,i was introduced to senco staple guns and a lot of line popping there.I found it was faster to go up a rack with a staple gun or coil nailer and it was all about speed back then.We were getting paid very low and had a lot of metal to hang and bull to smear.

September 11, 2010 at 7:30 a.m.

TomB

$5 degrees.....Waaaayyyyy quicker/efficient


« Back To Roofers Talk
You must be logged in to reply to this topic.

InvoiceIQ - Banner Ad - Catch Overcharges
Translate
Default
English
Español
Français

User Access


Sign up for Week in Outdoors eNews!
Contractor Outlook - Sponsored by SRS
CAM (Drexel Metals) -  Ad - Visualizer
WSRCA -  ad - WRE Ticket Giveaway
RCMA -  - Contractor Membership
Code Compliance Critical Buildings
NWIR - Empowering Women -