Translate
Default
English
Español
Français

User Access


Sign up for Week in Outdoors eNews!
IKO -  - Dynasty
Johns Manville -  Ad - Skylights 101
Malco Group -  Ad - One Partner, Countless Solutions
Renoworks -  Ad - AI Image Enhance
SPRI  Ad - DORA Directory
Roofing Alliance - Future of Roofing -
Translate
Default
English
Español
Français

high rise roofing

« Back To Roofers Talk
Author
Posts
December 20, 2016 at 8:16 a.m.

prsroof

This year we are bidding three 22 story and three 27 story buildings ,three separate owners. last year we did three 12 stories and five 8-10 stories we used hydraulic swing hoists for removal and loading. We always had two men on ground with tag lines for trays or cargo nets. Elevator is out of question for four of the buildings and crane are out for three, has anyone used the hoists on the 27 story buildings your looking about three hundred feet of tag lines I have 170' cable on both hoist but I can switch out drum cable to 300'

December 21, 2016 at 11:14 a.m.

prsroof

Elevator maybe on two, all are tear offs three of the buildings are getting floor by floor gutted the freight elevator will be tide up and this is a occupy building so personal elevator are out. We done them before with the elevators and usually moving debris and materials one or two floors by hand


« Back To Roofers Talk
You must be logged in to reply to this topic.

Sherwin Williams - Banner Ad - Roofing Passport IRE
Translate
Default
English
Español
Français

User Access


Sign up for Week in Outdoors eNews!
APOC - CCS  - ProProgram - June
Van Mark Products -  Ad - June-Jul2026 Rebates
Renoworks -  Ad - AI Image Enhance
RIIG -  Ad - AI Integrated Solutions
Malco Group -  Ad - One Partner, Countless Solutions
SoyLei -  Ad - APEX 1132 Rejuvenate