English
English
Español
Français

User Access


Glo Group - LDR Accelerator - Sidebar
GAF Sidebar Spanish Program
gFour Marketing - Sidebar Ad - Referrals
SRS - Sidebar Ad (En Espanol Page) - Roof Hub
Contractor Outlook - Sponsored by SRS
Rocky Mountain Snow Guards - Sidebar Ad - Free Shipping!
All Weather Insulated Panels - Sidebar Ad - OneDek
English
English
Español
Français

high rise roofing

« Back To Roofers Talk
Author
Posts
December 20, 2016 at 8:16 a.m.

prsroof

This year we are bidding three 22 story and three 27 story buildings ,three separate owners. last year we did three 12 stories and five 8-10 stories we used hydraulic swing hoists for removal and loading. We always had two men on ground with tag lines for trays or cargo nets. Elevator is out of question for four of the buildings and crane are out for three, has anyone used the hoists on the 27 story buildings your looking about three hundred feet of tag lines I have 170' cable on both hoist but I can switch out drum cable to 300'

December 21, 2016 at 11:14 a.m.

prsroof

Elevator maybe on two, all are tear offs three of the buildings are getting floor by floor gutted the freight elevator will be tide up and this is a occupy building so personal elevator are out. We done them before with the elevators and usually moving debris and materials one or two floors by hand


« Back To Roofers Talk
You must be logged in to reply to this topic.

General Coatings - Banner - Where will SF take you?
English
English
Español
Français

User Access


Glo Group - LDR Accelerator - Sidebar
Pli-Dek - Waterproofing L&L - Sidebar
TRA-VideoBrochure-Sidebar
USG - Sidebar - Impact
METALCON - Sidebar Ad - METALCON 2025
Sales Assist - Sidebar Ad - Build Present Close
NFBA - Sidebar Ad - Accredited Builder