English
English
Español
Français

User Access


BITEC-StormBreaker-Sidebar
Metal Sales - Sidebar Ad
Uniflex - Sidebar - Silicone Colors - Feb 24
Hi-Peak - Sidebar - Roofing Recruiter
RCS - Sidebar - L&L contest
MetalForming - Sidebar Ad - Generic
Malco Tools - Sidebar Ad - Metal Benders
English
English
Español
Français

Duro-Last PVC Protective Walkway Pad Issues

« Back To Roofers Talk
Author
Posts
May 24, 2019 at 2:18 p.m.

boilermaker73

Has anyone by chance ever experienced any problems/issues with welding/securing Duro-Last PVC protective walkway pads only to have them eventually break loose from the Duro-Last PVC roof membrane surface beneath? While the Duro-Last PVC side lap seams and roof membrane flashing appear to be in overall good repair and weather tight for a PVC single-ply roof installed back in 2016, the PVC walkway pads are not. Any comments/suggestions regarding this subject matter are most appreciated. While I do have photos to show what's happening, the forum does not appear to provide a way to upload them. Thank you ahead of time.

July 7, 2019 at 9:19 a.m.

roofrat

Sounds as if the membrane wasn't cleaned proper during installation. If you could try again, photos would be nice. 


« Back To Roofers Talk
You must be logged in to reply to this topic.

Anchor Products - Banner Ad - Coffee Shop Bars
English
English
Español
Français

User Access


BITEC-StormBreaker-Sidebar
Gibraltar - Sidebar Ad - Metal Roofing
BITEC-StormBreaker-Sidebar
All Weather Insulated Panels - Sidebar Ad - OneDek
ServiceFirstSolutions-Grow-Sidebar
Rocky Mountain Snow Guards - Sidebar Ad - Free Shipping!
Brava - Sidebar - Jan